2012-08-28 "How to Fix a Road" 1

Finally, the graded asphalt is steamrolled multiple times. Even so, vehicle traffic will continue to compress the new pavement well after the actual construction finishes.

As mentioned, though, this is only preparation for the next step, planned to happen this evening. Crews will take from 1 to 3 inches off of the entire width of the road surface and repave it.
SONY NEX-7, f/2.8 @ 16 mm, 1/40, ISO 1600, No Flash

2012-08-28 "How to Fix a Road" 1

2012-08-28 "How to Fix a Road" 1

Finally, the graded asphalt is steamrolled multiple times. Even so, vehicle traffic will continue to compress the new pavement well after the actual construction finishes.

As mentioned, though, this is only preparation for the next step, planned to happen this evening. Crews will take from 1 to 3 inches off of the entire width of the road surface and repave it.